Set up the roadway

Choose the conditions before work begins.

Educational Guidance • Reference Estimate

Your setup

EDUCATIONAL GUIDANCE • REFERENCE ESTIMATE ONLY

These calculations provide preliminary reference estimates based on FHWA MUTCD 11th Edition (Rev 1, Dec 2025) guidelines and do not constitute approved engineering designs or traffic-control plans. Results must be independently verified by a qualified traffic engineer against site conditions and local specifications before use. Full legal disclaimer →

Calculated taper length

245 ft Merging taper
Buffer space reference250 ftStopping sight distance · Table 6B-2
Max. taper device spacing35 ftGuidance · 1 × speed
Max. tangent device spacing70 ftGuidance · 2 × speed

Advance warning sign spacing

Approximate guidance · Table 6B-1

A100 ft
B100 ft
C100 ft
Formula usedL = W × S² ÷ 60 = 12 × 35² ÷ 60
Traffic direction
C100 ft
B100 ft
A100 ft
Taper245 ft
Buffer250 ft
Work area
Quick reference only—not an engineered traffic control plan.

Reference basis

Official sources

FHWA MUTCD 11th Edition with Revision 1 (December 2025). Calculations use Tables 6B-1 through 6B-4 and Section 6K.01. Values are guidance to be applied with engineering judgment and adjusted for field conditions.

MUTCDSearch Traffic Engineering Suite Conforming to FHWA MUTCD 11th Edition Rev 1
← All Tools Sign Sizing & Placement Tool → Sign Material Yield Tool → Stripe Paint Estimator →

IMPORTANT — FOR INFORMATIONAL AND EDUCATIONAL USE ONLY

FHWA MUTCD 11th Edition (Rev 1, Dec 2025)

MUTCDSearch.com provides general educational information, reference materials, and preliminary calculations. These tools are not intended for direct use in roadway construction, traffic-control installations, engineering design, or other safety-critical applications.

Results may not account for site-specific conditions, current regulations, state or local requirements, engineering exceptions, or changes to applicable standards.

All calculations, dimensions, spacing recommendations, and regulatory references must be independently verified against the current official MUTCD (FHWA 11th Edition with Revision 1, December 2025) and applicable state and local requirements.

Consult a qualified traffic engineer, certified traffic-control professional, or appropriate governmental authority before designing, approving, purchasing equipment for, or implementing any traffic-control installation.

MUTCDSearch.com is an independent reference website and is not affiliated with, endorsed by, or authorized by FHWA or the U.S. Department of Transportation.